Moment Energy has introduced Nova, a battery energy storage system (BESS) built from repurposed electric vehicle batteries.
The company says it is the first BESS of its kind to earn both UL 1973 and UL 9540 certification, which supports its use in commercial, industrial, and large-scale storage.
Nova is in production at the company’s Megafactory 1 for deployment across North America, and Moment Energy says earlier systems already power airports, hospitals, and agricultural and manufacturing sites.
Each Nova block delivers 200 kilowatts (kW) of power and 500 kilowatt-hours (kWh) of energy in a footprint of about 2.9 by 1.8 meters, and blocks can be combined into installations in the tens of megawatt-hours (MWh).
The platform accepts batteries from different types of EVs, and an AI-based battery management system tracks and balances packs at varying states of health.
“We see a future where reengineered EV batteries become essential infrastructure for powering businesses and onshoring manufacturing and supply chain,” said Edward Chiang, Co-Founder, CEO of Moment Energy, in a statement.
Moment Energy says Nova is made in North America and has been independently verified as compliant with foreign entity of concern (FEOC) requirements, and that the company itself is verified as a non-prohibited foreign entity.
It describes Nova as the only third-party verified BESS eligible for the federal Investment Tax Credit in 2027 and beyond.
Read more here.