Moving from residential to commercial PV means larger services, new voltage configurations, and more demanding code requirements. This course gives EPCs, designers, and installers the commercial-scale fundamentals that most often trip up teams making that transition.
It starts with an examination of the grid connection – the role of transformers, common service voltages, and how to evaluate single-, split-, and three-phase services. That includes 208Y/120 and 480Y/277 wye systems as well as ungrounded and high-leg delta configurations. The course also covers available fault current, and the SCCR and AIC ratings required.
Next, the course focuses on relevant National Electrical Code requirements for parallel power production source interconnections. Examples of voltage and current calculations will be provided, and participants will examine Article 705 interconnection allowances and requirements for both supply or load side connections, including circuits with power control systems (PCS) providing overload protection.Â