Roundtable: Made in America? A Roundtable on Domestic Content Rules
Roundtable: BESS in the Field: Lessons from Commissioning to Year One
Permits are only the beginning. For the teams building and operating battery storage, the hardest lessons come after: commissioning that slips past the in-service date, controls and communications that don’t…
The New Rules for EPCs, Post-ITC
The OBBBA forced a reckoning most EPCs weren’t prepared for: compressed schedules, tightened supply, and far higher stakes on every missed milestone. In this session, utility-scale and C&I EPC leaders…
LUNCHEON: The Gigawatt Gold Rush: Cracking the ERCOT Market
*Luncheon is included with the purchase of a Conference Pass with Lunch. For all other passes, luncheons are available to purchase as an add-on item to your registration No market…
LUNCHEON: Flexibility Pays: A Build-Side Look at Peak-Demand Revenue
*Luncheon is included with the purchase of a Conference Pass with Lunch. For all other passes, luncheons are available to purchase as an add-on item to your registration Electrification, data…
Roundtable: The Mid-Market Interconnection Bottleneck
Interconnection is the industry’s number one shared pain point, but the conversation almost always centers on the utility-scale queue. For installers, small C&I EPCs, and project managers building distributed and…
Grid Assets, Not Side Projects: Turning Distributed Resources into Dispatchable Capacity
For years, distributed energy resources like rooftop solar, home batteries, and EVs were treated as bill-savings tools. With FERC Order 2222 landing across the ISOs and a wave of state…
Delivery, Not Deal-Making: Powering the Data Center Build
Because data center load is arriving faster than firm capacity can be built, developers who are able to close that gap are the ones setting the pace for everyone else….
From Projects to Portfolio: Scaling C&I Value
For seasoned C&I EPCs and developers, the opportunity has shifted from winning individual projects to capturing more value and scaling into higher-margin work. This fireside chat pairs a C&I developer-owner…
Hit Your COD, Keep Your Credit
With the December 31, 2027, place-in-service deadline within sight, the difference between projects that capture the full 48E/45Y credit and those that lose it comes down to engineering and execution…
BESS Fire Safety: Permitting Without the Scramble
Treating fire and safety as a late-stage checkbox comes with a cost. By the time AHJs and inspectors raise objections, installers and EPCs are already losing time and money. This…
From Concept to Commissioning: De-Risking the C&I Project Lifecycle
Most C&I projects don’t fail at any single stage. Instead, they falter in the handoffs between them: the financing assumption that doesn’t survive engineering, the interconnection surprise that resets the…